Voyager DP-263-S Guía de usuario Pagina 127

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 612
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 126
Startup and Shutdown
Voyager
Biospectrometry
Workstation User’s Guide 2-49
2
Powering down
the mass
spectrometer
If you need to perform maintenance on internal parts or move
the system, power down the spectrometer:
1. Power down the system components.
2. Turn off the main power switch. The power switch is
located:
On the right side panel of the mass spectrometer
cabinet on Voyager-DE and Voyager-DE PRO
systems.
On the back panel of the mass spectrometer
cabinet on the Voyager-DE STR system.
Vista de pagina 126
1 2 ... 122 123 124 125 126 127 128 129 130 131 132 ... 611 612

Comentarios a estos manuales

Sin comentarios