Voyager DP-263-S Guía de usuario Pagina 106

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 612
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 105
Chapter 2 Installing the Voyager™ Biospectrometry™ Workstations
2-28 PerSeptive Biosystems
2
Starting
Sequence Control
Panel
To start the Sequence Control Panel from the Windows NT
desktop:
1. Make sure the Instrument Control Panel is running.
NOTE: If you start the Instrument Control Panel using
the Sequence Control Panel icon, it functions the same
way as if you started it using the Instrument Control
Panel icon, with two exceptions. Warning and error
messages are not displayed during operation, and the
Instrument Control Panel will close when you close the
Sequence Control Panel.
2. Double-click the Sequence Control Panel icon on the
desktop.
NOTE: You can also click a toolbar button in the
Instrument Control Panel to start the Sequence Control
Panel.
The Sequence Control Panel opens (Figure 2-15).
Figure 2-15 Sequence Control Panel
Vista de pagina 105
1 2 ... 101 102 103 104 105 106 107 108 109 110 111 ... 611 612

Comentarios a estos manuales

Sin comentarios